RENER ENERGY
Skip to main content
Nexus Platform · EMS & SCADA for BESS and Solar PV

Energy made
visible. Controllable.Market-ready.

RENER ENERGY builds complete SCADA and EMS software for Battery Energy Storage Systems and Solar PV. Real-time monitoring, closed-loop control, grid support, and aggregator connectivity — proven across 5 commissioned BESS plants in Central Greece.

Plants commissioned across Central Greece
5 BESS
Plants commissioned across Central Greece
Signals in <600ms via parallel connections
7,000+
Signals in <600ms via parallel connections
1-second monitoring loops
<600ms
1-second monitoring loops
  • SCADA for Solar PVNEW
  • EMS & SCADA for BESS
  • Nexus PlatformFLAGSHIP
  • IEC 61850 · IEC 104 · Modbus TCP
  • FCR / aFRR / mFRR
  • HEDNO Compliant
  • AI/ML Predictive Analytics
  • ISO 9001 · ISO 27001 · NTS v2.0

About us

RENERENERGYisaninnovativetechnologycompanyintheenergysector,specializinginsoftwaresolutionsforRenewableEnergySourcesandBatteryEnergyStorageSystems(BESS).

The company develops integrated SCADA systems for photovoltaic plants and Energy Management Systems (EMS) for storage projects, unified in its proprietary NEXUS platform, offering advanced capabilities for monitoring, controlling, and optimizing the operation of energy projects.

Nexus Platform

One platform, from control to the market

Control, architecture, security, and market integration — all under Nexus.

Control & automation

Closed-loop control at the point of interconnection

Closed-loop PID algorithms ensure accurate setpoint tracking at the Point of Interconnection (POI). Each mode follows reference values from the grid operator or aggregator, with configurable ramp rates and droop slopes per grid code.

Power control

Active Power Control

Tracks a reference value. Negative means absorption, positive means injection, with configurable ramp rates.

Reactive Power Control

Reactive setpoint tracking with the same absorption and injection logic for grid-stability services.

Power Factor (cos φ)

Maintains cos φ at the interconnection point by modulating reactive power relative to active.

Ramp Rate Control

Controlled rate of change for power injection and absorption.

Grid support

Frequency Support

Active-frequency droop on the operator's P-F curve. FSM for ±200 mHz, LFSM-O/LFSM-U for larger excursions.

Voltage Control

Reactive droop at the POI following a U–Q characteristic, tunable per grid code.

State of Charge

Manages SoC bands across all plant containers.

Grid-Forming

Grid-forming capabilities for black-start and weak-grid operation.

EMS & SCADA for BESS

Integrated control and optimization for storage. Closed-loop PID, SoC management, grid-forming, and grid support from a single point, with sub-second response for real-time grid services.

Nexus

Online

Proven across 5 commissioned BESS plants.

Nexus

Platform

Nexus Energy Platform

Cloud platform for live monitoring, alarms, historical data, setpoints, and remote management of the whole portfolio from one screen.

Search park...

Station status

Live online

LiveEMSSCADA
HEDNO status
ConnectedIEC 104

SCADA for Solar PV

>400 kW

Multi-vendor, with or without a logger.

Remote control & HEDNO compliance

Advanced remote control and telemetry fully compliant with DSO requirements, including DEDDIE specifications. Secure encrypted communication (IEC 60870-5-104 / IEC 61850), real-time data exchange with grid operators, remote command execution, and event logging for regulatory compliance.

Modbus TCP
RTU
Nexus Cloud
Live
HEnEx/IPTO
Data

Process

How your plant goes live in Nexus

We start from the station's real equipment (BMS, PCS, meters, MV/LV), not a generic template. We map it, install the redundant controller, and deliver operational visibility and control inside Nexus.

Technical site mapping

We document capacity, BMS, PCS, meters, MV/LV, communications, and project obligations.

Redundant controller

We install the clustered PPC (Advantech MIC-770 V3) with automatic failover and field accessories.

Protocols & network

Modbus, IEC 61850, IEC 104/101, MMS & GOOSE in the field and IEC 104 toward HEDNO, with supervision UI.

Live operations & market

Closed-loop control, live monitoring, alarms, setpoints, and data ready for aggregator workflows.

Why Nexus

Built for BESS and Solar PV

Six reasons operators and aggregators choose Nexus over generic SCADA platforms.

Scalable

Cloud-native fleet management

From one site to a national portfolio — the same platform, the same dashboard, zero reconfiguration.

<600ms

7,000+ signals, 1-second loops

High-speed parallel data acquisition with sub-second response for real-time grid services.

Zero-trust

Enterprise authentication & encryption

Role-based access, encrypted channels, and immutable audit logs across all user and system interactions.

Redundant

Clustered PPC & dual storage

Redundant on-site hardware with automatic failover and dual cloud backup — no single point of failure.

Compliant

Full grid-code & DSO/TSO support

Pre-deployment validation, HEDNO certification, and continuous compliance monitoring built in.

AI/ML

Predictive analytics & fleet insights

Machine learning tools for anomaly detection, performance forecasting, and fleet-wide optimization.

FAQ

Clear answers for BESS and PV owners

The essentials before connecting your station to Nexus or preparing market-ready operations.

Battery storage (BESS) and photovoltaics, with or without a logger, multi-vendor inverters, BMS, PCS, MV/LV, and cooling and fire-suppression subsystems.

Proven in the field

5 commissioned BESS plants

RENER ENERGY's EMS solution is commissioned across five battery energy storage projects in Central Greece.

Central Greece

Agia Anna

Power
7.8 / 10 MW
Capacity
15.6 / 30.09 MWh

Agia Anna I

Power
7.8 / 10 MW
Capacity
15.6 / 30.09 MWh

Dokos

Power
8.875 / 11 MW
Capacity
17.75 / 25.075 MWh

Petra

Power
7.8 / 10 MW
Capacity
15.6 / 20.32 MWh

Tsouka

Power
7.9 / 10.28 MW
Capacity
31.6 / 40.12 MWh

Your project

Bring your plant into Nexus